Construction & Engineering

Designing, building and commissioning the physical campuses that house AI compute

Heat (est.) Spend (est.)

The largest single line of AI spend, and skilled electrical labour is scarce — but contractors keep taking work, so it is tight rather than rationed.

AI data centers require general contractors, specialist electrical and mechanical crews, design engineers and prefabrication factories. Builders coordinate power, cooling, structure and commissioning; materials distributors and rental fleets keep large sites moving.

Why now

Large AI campuses compress schedules while electrical labor, equipment lead times and utility readiness remain constraints. In 2026 acquisitions and factory expansion are pushing contractors toward integrated MEP delivery and off-site assembly.

US campus delivery

US campus delivery combines general contracting, civil work, regional specialty trades and construction management. Proven projects and the capacity to coordinate simultaneous sites distinguish current work from market-entry ambitions.

Heat (est.)
  1. Turner builds Meta's Lebanon campus with Mortenson and CoreWeave's Lancaster facility; ACS remains ultimate parent

    leader
    HOT.DE · XETRA · DEExposure
  2. Data and telecom practice reports more than 6.4 GW delivered across US hyperscale and colocation campuses

    leader
    Private · USExposure
  3. QTS projects include Richmond, Northern Virginia and Portland campuses with phased data hall construction

    major
    Private · USExposure
  4. Meta Henrico's five-building campus demonstrates integrated hyperscale shell, systems and phased delivery

    major
    Private · USExposure
  5. Meta's approximately four-million-square-foot Lebanon campus is being built with Turner and Faith Technologies

    major
    Private · USExposure
  6. Meta Temple's 152 MW campus includes self-performed concrete and 750 prefabricated multi-trade racks

    major
    Private · USExposure
  7. University of Florida East Campus facility and HiPerGator 2.0 infrastructure upgrades provide named HPC construction references

    major
    Private · USExposure
  8. Compute business delivers integrated hyperscale design-build; Centene's IT Renaissance project is a named data center reference

    major
    Private · USExposure
  9. Meta Singapore campus construction extends its US hyperscale delivery experience to a large Asian facility

    major
    Private · USExposure
  10. Mission Critical practice reports 418 MW completed and more than 2 GW in planning, design or preconstruction

    major
    Private · USExposure
  11. Progressive design-build services cover modular data centers, greenfield campuses and early engineering coordination

    major
    Private · USExposure
  12. Modularizing Nvidia Omniverse DSX blueprints for gigawatt-scale AI factory engineering and construction

    challenger
    Private · USExposure
  13. Limited notice to proceed with TeraWulf covers early work on a large Kentucky data center project

    challenger
    FLR · USExposure
  14. First turnkey data center construction-management award joins nearly $1 billion of related bookings across multiple jobs

    challenger
    MTZ · USExposure
  15. General contractor for Related Digital's $16 billion Saline Stargate campus, purpose-built for Oracle and OpenAI

    major
    Private · USExposure
  16. West Virginia data center work is in preconstruction in the August 2026 update; full construction is not confirmed

    emerging
    SHIM · USExposure
  17. Data Center Modernization practice manages site selection, design, construction and commissioning for critical facilities

    niche
    PSN · USExposure
  18. QTS York County campus construction includes nine planned buildings; the first steel topping-out occurred in June 2026

    major
    Private · USExposure
  19. General contractor for Meta's 715,000 sq ft Montgomery campus, with completion targeted for late 2026

    major
    Private · USExposure
  20. ATL01-2 and ATL01-3 design-build work adds data halls and phased electrical capacity to an Atlanta campus

    major
    Private · USExposure
  21. Latisys and Monterey Park data centers provide named construction references for its Mission Critical practice

    niche
    Private · USExposure
  22. Mission Critical team uses BIM and virtual construction to coordinate data center preconstruction and building delivery

    niche
    Private · USExposure
  23. Layton builds an 80 MW West Jordan expansion with six data halls and associated campus infrastructure

    major
    Private · USExposure
  24. Arizona hyperscale delivery includes a six-building campus and a separate Goodyear mission-critical project

    major
    Private · USExposure

Sources: holderconstruction.com, hitt.com, dpr.com, henselphelps.com, gilbaneco.com, sundt.com

European campus contractors

European-headquartered contractors deliver campuses and MEP packages in Europe and overseas. Their references cover shell construction, technical fit-out and phased handover; headquarters geography does not imply every project is European.

Heat (est.)
  1. Turnkey delivery includes a 22 MW Dublin data center and hyperscale campuses in Frankfurt, Amsterdam and Finland

    leader
    Private · IEExposure
  2. Three Frankfurt-region AI data center awards total about 80 MW and EUR 750 million, targeted for completion by 2028

    leader
    Private · DEExposure
  3. FRA11, FRA13, FRA15 and Paris Digital Park projects combine technical construction and large data center fit-out

    major
    Private · IEExposure
  4. In-house MEP and high-voltage teams deliver hyperscale fit-outs and retrofits inside operating data centers

    major
    Private · IEExposure
  5. Hyperscale and colocation MEP installation includes resilient electrical and mechanical systems under Cathexis ownership

    major
    Private · IEExposure
  6. More than 600 MW delivered since 2010 across Ireland, the UK and continental European data center markets

    major
    Private · IEExposure
  7. Energies Building Solutions unit designs, installs and maintains hyperscale electrical and mechanical infrastructure

    major
    DG.PA · Euronext Paris · FRExposure
  8. MDBI built VITRO Santa Rosa's 50 MW IT facility and 18 data halls, delivered in May 2025

    major
    EN.PA · Euronext Paris · FRExposure
  9. CloudHQ Lisses construction includes heat recovery connections to the nearby district heating network

    major
    FGR.PA · Euronext Paris · FRExposure
  10. Multi-technical data center contracts install and maintain facility power, cooling and automation systems

    major
    SPIE.PA · Euronext Paris · FRExposure
  11. High-tech construction practice has delivered more than fifteen European data centers alongside semiconductor facilities

    major
    STR.VI · ATExposure
  12. A new 38.4 MW Virginia colocation building contract covers shell, MEP and site utilities through 2028

    major
    SKA-B.ST · Nasdaq Stockholm · SEExposure
  13. European-headquartered builder booked about $350 million of US Northwest and Mid-Atlantic data center work in H1 2026

    major
    BBY.L · LSE · GBExposure
  14. MAD01 Alcobendas is planned for 60 MW gross power and 40 MW IT load; delivery and investment remain phased commitments

    emerging
    FER · NLExposure

Sources: exyte.net, mercuryeng.com, kirbygroup.com, collen.com, buildingsolutions.vinci-energies.com, strabag.com

Asian campus delivery

Asian contractors and design firms deliver campus shells, MEP systems and technical fit-out. Selection depends on local permitting, utility coordination, schedule, engineering capability and proven regional data center work.

Heat (est.)
  1. AirTrunk TOK1 and TOK2 delivery combines campus development with large Japanese hyperscale construction

    leader
    1925.T · TSE · JPExposure
  2. Port Dickson hyperscale contract includes site infrastructure and MEP fit-out, scheduled from 2026 to early 2028

    leader
    5398.KL · MYExposure
  3. AirTrunk TOK2 construction joins a dedicated data center practice covering design, scheduling and systems integration

    major
    1802.T · TSE · JPExposure
  4. Dedicated data center design-build practice integrates seismic protection, facility systems and global delivery

    major
    1812.T · TSE · JPExposure
  5. ZED Ishikari demonstrates renewable-powered data center architecture and construction in northern Japan

    major
    1801.T · TSE · JPExposure
  6. Gunma data center expansion combines structural construction with future-ready systems and phased campus design

    major
    1803.T · TSE · JPExposure
  7. Dedicated data center delivery integrates reliability engineering, building design and adaptable facility construction

    major
    Private · JPExposure
  8. Ansan Global Cloud Center's KRW 400 billion, 40 MW construction contract with IGIS anchors its dedicated data center team

    major
    028260.KS · KRX · KRExposure
  9. Naver Gak Sejong and 64 MW Pacific Sunny are completed references; Ansan and Gimpo projects extend the order book

    major
    000720.KS · KRX · KRExposure
  10. Naver Gak Chuncheon, LG Uplus Pyeongchon and EPOCH Anyang provide completed Korean data center references

    major
    006360.KS · KRX · KRExposure
  11. Gasan data center completion and Gimpo construction add fourth overseas-customer facility work in Korea

    major
    375500.KS · KRX · KRExposure
  12. Ecoplant subsidiary constructs the SK-AWS Ulsan AI campus; attribution is to its listed controlling holding company

    major
    034730.KS · KRX · KRExposure
  13. Vyoma's Chennai facility and planned Navi Mumbai AI campus combine domestic data center development and construction

    major
    LT.NS · NSE · INExposure
  14. Johor data center and substation work plus a Serendah hyperscale contract support phased delivery through 2028

    major
    5263.KL · MYExposure
  15. Elmina hyperscale project awards RM 1.26 billion for core, shell and site infrastructure through 2027

    major
    3336.KL · MYExposure
  16. Empyrion TW1 in Taipei includes turnkey structure, architecture and MEP work, with RSEA performing civil construction

    major
    6139.TW · TWSE · TWExposure
  17. Commercial & Institutional Projects group offers EPCM, MEP and HVAC delivery for AI data centers; no customer is named

    niche
    5536.TWO · TPEx · TWExposure
  18. Data center HVAC design uses CFD airflow analysis and temperature sensing to control server-room thermal distribution

    niche
    Private · JPExposure
  19. Leighton Asia builds Goodman's new Hong Kong high-rise data center, including shell, core and two basement levels

    major
    HOT.DE · XETRA · DEExposure
  20. Environmental Systems engineers and installs HVAC for Japanese data center projects disclosed in its integrated report

    niche
    1979.T · TSE · JPExposure
  21. Smart Building teams install data center communications, electrical backup and precision air-conditioning systems

    niche
    1961.T · TSE · JPExposure
  22. FY2026 results identify data center electrical-facility orders with completion scheduled for the year ending March 2028

    niche
    1950.T · TSE · JPExposure
  23. Architecture and facility design references include Fugaku's computing facility and SCSK netXDC Sanda SH2

    niche
    Private · JPExposure

Sources: airtrunk.com, kajima.co.jp, hdec.kr, acter.com.tw, nikken.jp, leightonasia.com

Electrical & mechanical contractors

Specialist trades install and commission high-current electrical networks, cooling piping and controls. Labor availability, prefabrication and experience with live mission-critical facilities govern execution.

Heat (est.)
  1. Miller Electric and other subsidiaries install hyperscale power distribution, piping and controls; acquisition closed in 2025

    leader
    EME · USExposure
  2. Mechanical, electrical and process-piping crews install AI facility MEP systems supported by expanding modular factories

    leader
    FIX · USExposure
  3. Cupertino Electric installs campus power systems; Dynamic Systems adds mechanical and process-piping scope

    major
    PWR · USExposure
  4. Communications division designs and installs data center network infrastructure; custom power teams integrate electrical systems

    major
    IESC · USExposure
  5. Project Goliath and Mesa campus electrical work underpin more than 15 GW of reported data center power delivered

    major
    Private · USExposure
  6. Northern Virginia campus delivery includes 103 power-delivery modules and 450 medium/low-voltage equipment assemblies

    major
    Private · USExposure
  7. Meta Lebanon scope includes near-site electrical manufacturing, integration facilities and two materials warehouse hubs

    major
    Private · USExposure
  8. Therma designs and installs critical HVAC, process piping and controls; portfolio teams address direct-to-chip cooling

    major
    LGN · USExposure
  9. E&M subsidiaries install power, communications, fire suppression and mechanical systems for growing data center workloads

    major
    ECG · USExposure
  10. Sturgeon Electric's Iron Mountain Arizona project includes electrical installation, BIM coordination and commissioning

    major
    MYRG · USExposure
  11. MEPC construction and Day II support include cooling piping, heat-exchanger skids and high-purity mechanical systems

    major
    LMB · USExposure
  12. Vantage AZ1 and Sabey Ashburn projects combine mechanical design-build delivery with data center commissioning

    major
    Private · USExposure
  13. Off-site cooling modules, heat-recovery assemblies and electrical skids support dense AI facility MEP construction

    major
    Private · USExposure
  14. Precision cooling and fire-protection engineering, installation and maintenance serve new and retrofit data center projects

    niche
    Private · USExposure
  15. Facility electrical installation and thermal solutions support a strategy prioritizing Japanese data center construction

    major
    1942.T · TSE · JPExposure
  16. Highreso partnership applies electrical, HVAC and communications construction to GPU data center development

    major
    1944.T · TSE · JPExposure
  17. Green Air IDC services optimize data center cooling through design, installation, commissioning and operating support

    major
    1969.T · TSE · JPExposure
  18. Chubb Fire & Security designs, installs and commissions data center fire detection, suppression and access-control systems

    major
    APG · USExposure
  19. Live-facility electrical assessments, controls integration and phased commissioning support data center power upgrades

    niche
    WLDN · USExposure
  20. Energy Services engineers campus electrical protection and critical facility systems, including commissioning support

    niche
    RCMT · USExposure
  21. Cobalt Cheyenne data center electrical installation supports 5.5 MW in Las Vegas under Burke Construction

    niche
    Private · USExposure
  22. CyrusOne Chandler electrical installation covers power systems for a 186,000 sq ft facility with JE Dunn as contractor

    niche
    Private · USExposure
  23. NCAR Wyoming Supercomputing Center electrical work supports critical power and computing infrastructure in Cheyenne

    niche
    Private · USExposure
  24. Corbins electrical crews support the group's 100 MW Reno data center construction program announced in March 2026

    major
    Private · USExposure

Sources: investors.quantaservices.com, ir.dycomind.com, strlco.com, helixelectric.com, bergelectric.com, chubbfs.com

Design, engineering & commissioning

Architects and engineers turn a power allocation into a buildable campus and validate cooling, electrical and water systems. Early site work and digital models reduce redesign before costly equipment is ordered.

Heat (est.)
  1. Nvidia Omniverse DSX digital twins model gigawatt-scale AI campuses, including compute, power and cooling interactions

    leader
    J · USExposure
  2. CyrusOne Kincora's 45 MW campus design uses precast structures and 32 modular power rooms to compress construction

    leader
    Private · USExposure
  3. High Tech practice combines site selection, liquid-cooling design, water reuse, electrical studies and commissioning management

    major
    ACM · USExposure
  4. Page acquisition adds mission-critical architecture and engineering capacity, following its July 2025 completion

    major
    STN · CAExposure
  5. kW Mission Critical Engineering leads US data center design within a global advisory, delivery and operations practice

    major
    WSP.TO · TSX · CAExposure
  6. Ten new Frankfurt and Berlin commissions add to an international portfolio of data center advisory and delivery projects

    major
    ARCAD.AS · Euronext Amsterdam · NLExposure
  7. Data center teams combine permitting, building design, energy integration and commissioning across European markets

    major
    SWEC-B.ST · Nasdaq Stockholm · SEExposure
  8. More than 100 data center assignments span feasibility, building design, grid connections and site supervision

    major
    AFRY.ST · Nasdaq Stockholm · SEExposure
  9. Equinix LD6 in Slough combines structural, MEP and architectural design with CFD thermal modeling and evaporative cooling

    major
    Private · GBExposure
  10. TeraWulf Lake Mariner engagement covers engineering, permitting, procurement, project management and system commissioning

    major
    Private · DKExposure
  11. Meta Temple architecture and mission-critical engineering connect campus planning with power, cooling and construction

    major
    Private · USExposure
  12. Integrated campus design combines buildings with dedicated power, water, communications and construction delivery

    major
    Private · USExposure
  13. STTGDC Defu and Loyang campus design covers multidisciplinary engineering from site acquisition to commissioning

    major
    Private · USExposure
  14. Wonder Valley's proposed Alberta AI campus masterplan supports phased facilities; the full 7.5 GW is a development ambition

    major
    Private · USExposure
  15. A 350 MW hyperscale build-out combines N+1 electrical design, an 82,000-ton chilled-water plant and thermal storage

    major
    Private · USExposure
  16. Integrated facility design combines structural and seismic work, HVAC piping, electrical resilience and water optimization

    major
    TTEK · USExposure
  17. US hyperscale teams provide construction cost management and project controls under a September 2026 program expansion

    niche
    ATRL.TO · TSX · CAExposure
  18. BCEI awarded engineering for three US data center energy centers integrating on-site generation, BESS and power distribution

    niche
    WOR.AX · ASX · AUExposure
  19. Turner & Townsend manages cost and delivery for Vantage's African campuses and Khazna's Middle East expansion

    major
    CBRE · USExposure
  20. Data center teams provide site, utility and multidisciplinary design; a UK-Europe delivery lead was appointed in August 2026

    niche
    Private · GBExposure
  21. Layer 9's 75,000 sq ft facility and EdgeCore Phoenix campus use its architecture and engineering services

    niche
    Private · USExposure
  22. CyrusOne SAT2 and Carrollton commissioning tests generators, UPS and integrated facility systems through handover

    major
    Private · USExposure
  23. eBay Project Mercury in Phoenix provides a named mission-critical MEP design reference

    niche
    Private · USExposure
  24. Dedicated data center practice covers test-fit design, construction supervision and integrated systems commissioning

    niche
    6462.TWO · TPEx · FRExposure

Sources: jacobs.com, aecom.com, wsp.com, worley.com, turnerandtownsend.com, syska.com

Modular & prefabricated facilities

Factories assemble power rooms, cooling skids and complete IT modules before shipment. Repeatable designs and integrated testing shorten field schedules, but transport and site integration remain important.

Heat (est.)
  1. OneCore integrates prefabricated power, cooling and data hall blocks for 10-250 MW campuses and larger configurations

    leader
    VRT · USExposure
  2. Prefabricated Modular IT Pods combine power and hybrid cooling for more than forty high-density racks per pod

    leader
    SU.PA · Euronext Paris · FRExposure
  3. Fibrebond, acquired in April 2025, factory-builds pre-integrated electrical enclosures for hyperscale campuses

    major
    ETN · IEExposure
  4. Prefabricated turnkey power, cooling and IT units combine Anord Mardix distribution with staged factory testing

    major
    FLEX · USExposure
  5. Silent-Aire modular data centers; 2026 Armada Galleon Forge One agreement adds manufacturing for packaged AI infrastructure

    major
    JCI · IEExposure
  6. Trachte electrical buildings and acquired Avail equipment package protected power rooms for fast campus deployment

    major
    NVT · GBExposure
  7. PCR and eHouse packages integrate switchgear and controls into factory-built electrical rooms

    major
    POWL · USExposure
  8. PCX prefabricated electrical distribution centers combine switchgear and critical power equipment before site delivery

    major
    HUBB · USExposure
  9. Prefabricated AI modular design integrates 800 VDC in-row power and 3 MW liquid cooling systems

    major
    2308.TW · TWSE · TWExposure
  10. FusionDC1000C, B and A prefabricated modules span hyperscale facilities through smaller enterprise and edge sites

    major
    Private · CNExposure
  11. RiMatrix preconfigured modules provide up to 400 kW cooling capacity; micro data centers serve smaller edge deployments

    major
    Private · DEExposure
  12. DCBBS site infrastructure and Vera Rubin NVL72 blueprints integrate modular power, cooling and rack deployment

    challenger
    SMCI · USExposure
  13. Galleon Cruiser and Triton modular edge data centers house three or five racks with integrated power and cooling

    challenger
    Private · USExposure
  14. Northstar's Quantum modules package 100 kW and up to 12 racks with integrated power and mechanical cooling

    niche
    QMCO · USExposure
  15. Duos Edge AI's modular Waco facility entered operation in 2026 for Region 12 Education Service Center

    emerging
    DUOT · USExposure
  16. Spark modular data centers are deploying at Energy Vault's initial 8 MW Snyder site, targeted for operation in 2027

    challenger
    Private · USExposure
  17. E-House modular substations package switchgear and controls in factory-built electrical buildings for campus deployment

    niche
    010120.KS · KRX · KRExposure
  18. PowerSecure PowerBlock packages generation and electrical controls for prefabricated campus power infrastructure

    niche
    SO · USExposure
  19. Modular data center infrastructure demonstrated at GTC 2026 combines server deployment with power and cooling blocks

    challenger
    2317.TW · TWSE · TWExposure
  20. AI Mod POD DC8 and DC16 provide 0.8 MW and 1.6 MW of prefabricated liquid-cooled data center capacity

    major
    HPE · USExposure
  21. MDC Flex packages 5-100 racks with power and thermal infrastructure, supporting specified loads up to 115 kW per rack

    major
    DELL · USExposure
  22. Factory-built edge data centers package 100-750 kW of power, cooling and IT space in standardized building modules

    niche
    Private · GBExposure
  23. SMART Granular Modular systems provide pre-engineered indoor or outdoor data center buildings with staged expansion

    niche
    Private · GBExposure
  24. Airedale High-Density AI IT Modular platform packages factory-tested data center power, cooling and IT capacity

    challenger
    MOD · USExposure

Sources: vertiv.com, se.com, eaton.com, hpe.com, dell.com, northstartgi.com

Site services & rentals

Civil contractors, commissioning specialists and rental providers prepare and support data center campuses. Scope includes earthworks, surveys, safety testing, temporary utilities and construction equipment; manufactured materials are listed separately.

Heat (est.)
  1. E-Infrastructure crews perform large campus earthwork, underground utilities and site preparation for hyperscale builds

    leader
    STRL · USExposure
  2. Civil, power and telecom scope supports integrated data center site management and new turnkey campus awards

    major
    MTZ · USExposure
  3. Dedicated data center services build on-site generation, BESS, power delivery and network infrastructure

    major
    PRIM · USExposure
  4. First data center award covers $24 million of earthwork, wet utilities, drainage and paving, with completion in 2027

    emerging
    CDNL · USExposure
  5. Concrete division reports 46 completed or active data center projects; data centers were 40% of fourth-quarter 2025 segment sales

    major
    ORN · USExposure
  6. Data center construction and maintenance rentals include aerial access, temporary power, cooling and fluid handling

    major
    URI · USExposure
  7. Dedicated data center rental service spans site construction, load-bank commissioning and ongoing facility maintenance

    major
    SUNB · USExposure
  8. ProSolutions temporary cooling and rental equipment support data center construction and HVAC contingencies

    major
    HRI · USExposure
  9. Modular jobsite offices and storage serve data center builds; management places the submarket below 5% of revenue

    niche
    WSC · USExposure
  10. Temporary generators, cooling equipment and load testing support data center construction, commissioning and grid delays

    major
    Private · GBExposure
  11. PurgeRite performs coolant-loop flushing, purging and filtration before liquid-cooled facilities enter service

    major
    VRT · USExposure
  12. Dedicated data center civil division had $223 million of committed and awarded projects at June 2026, up from $65 million

    challenger
    GVA · USExposure
  13. Lone Star Paving and Overland/Ellsworth build Texas and Oklahoma data center paving, sitework and utility packages

    challenger
    ROAD · USExposure
  14. Virginia data center electrical and fire-protection packages total about $10 million completed and $10 million in backlog

    niche
    ESOA · USExposure
  15. Power Solutions, acquired in December 2025, delivers Mid-Atlantic data center electrical construction

    major
    DY · USExposure
  16. Riggs Distler's July 2026 J.J. White acquisition adds data center mechanical and electrical construction capability

    challenger
    CTRI · USExposure
  17. AI facility work includes a 300 MW Alabama project and electrical/civil support for multiple US campus expansions

    challenger
    BWMN · USExposure
  18. NV5 and Acuren provide campus commissioning, construction inspection and materials testing after their 2025 merger

    major
    TIC · USExposure
  19. Electrical testing, maintenance and safety supplies support operating data center facilities and service contractors

    niche
    GWW · USExposure
  20. Cranes, digger derricks and aerial equipment support data center site electrical work and utility construction

    niche
    CTOS · USExposure
  21. Phoenix hyperscale campus fit-out includes doors, frames, hardware and architectural woodwork across 640,000 sq ft

    niche
    Private · USExposure
  22. Utility-side substation construction includes two completed Northern Virginia projects serving Data Center Alley

    niche
    MTRX · USExposure

Sources: prnewswire.com, prim.com, investors.wesco.com, isecinc.com, grainger.com, finance.yahoo.com

Building materials & cables

Concrete, aggregates, structural systems and power cables form the physical campus. Owners and contractors buy specified materials and coordinated distribution services for shells, utilities and electrical routes.

Heat (est.)
  1. Data center electrical and communications procurement generated $1.4 billion of first-quarter 2026 sales

    leader
    WCC · USExposure
  2. Critical Infrastructure teams fabricate and deliver cooling-water pipe, valves, fire lines and site utility materials

    major
    FERG · USExposure
  3. Electrical distribution serves US campus builds; management reported data centers at 9% of US sales in July 2026

    major
    RXL.PA · Euronext Paris · FRExposure
  4. Steel, PVC and fiberglass conduit plus wire-basket and aluminum cable trays protect data center electrical routes

    major
    ATKR · USExposure
  5. Data Systems racks and containment pair with insulated panels, rebar and structural steel for complete facility shells

    major
    NUE · USExposure
  6. ADVNSYS and Tate supply raised access floors, containment and data center structural systems; retained after cancelled IPO

    major
    KRX.IR · IEExposure
  7. Oldcastle Infrastructure supplies precast utility vaults, cable-management enclosures and drainage for data center sites

    major
    CRH · IEExposure
  8. Project Mustang in Indiana uses coordinated water, wastewater and storm-drainage supply for a campus exceeding 600 acres

    major
    CNM · USExposure
  9. N-12 stormwater pipe and Nyloplast basins capture roof, road and parking runoff across large data center sites

    niche
    WMS · USExposure
  10. Crushed-stone aggregates feed data center concrete, foundations and civil works; current demand is identified in 2026 results

    major
    VMC · USExposure
  11. Aggregates supply six Kansas City-area data center projects identified in its second-quarter 2026 update

    major
    MLM · USExposure
  12. Supplies concrete and roofing for Meta Rosemount; the campus includes 570 cubic yards of an AI-designed concrete mix

    major
    AMRZ · CHExposure
  13. Ready-mix concrete supplies Serverfarm CTX2, a 60 MW AI-ready data center development in Houston

    major
    CX · MXExposure
  14. Encore Wire building wire and campus power cables connect data center substations, switchboards and data halls

    major
    PRY.MI · Borsa Italiana · ITExposure
  15. Low- and medium-voltage power cables provide fire-rated distribution routes within data center campuses

    major
    NEX.PA · Euronext Paris · FRExposure
  16. QWIKwhip power whips and building wire connect data hall equipment and campus electrical distribution

    major
    Private · USExposure
  17. Distributes specified cable, electrical equipment and connectivity products with logistics support for campus builds

    major
    Private · USExposure
  18. Rebar reinforces data center foundations and structures; 2026 results identify demand in the Mid-Atlantic and South Central US

    major
    CMC · USExposure
  19. New Millennium steel joists, girders and deck form data center roofs and floors within its national fabrication business

    major
    STLD · USExposure

Sources: amrize.com, cemexusa.com, prysmian.com, nexans.com, southwire.com, sec.gov

Glossary

MEP
Mechanical, electrical and plumbing systems, including cooling pipes, power distribution and building services.
EPC
Engineering, procurement and construction: a contractor coordinates design, equipment purchasing and physical delivery.
Commissioning
Testing individual systems and their interactions to verify that a facility works safely under normal and failure conditions.
Core and shell
The building structure and envelope before the detailed electrical, cooling and IT fit-out.

Heat, spend, exposure and shares are editorial estimates. How to read the map ↗