Data Center Owners & Operators

Owning powered buildings and campuses that cloud and AI tenants lease

Heat (est.) Spend (est.)

Vacancy is near zero and capacity leases years before it is built, but the constraint lands upstream in power and construction rather than on the landlords.

Landlords deliver reliable power, cooling, buildings and connectivity to tenants that install computing equipment. The market spans listed colocation operators, private hyperscale developers, regional campuses and former mining sites converted into long-term AI leases.

Why now

Long AI leases and constrained power access are drawing capital into larger campuses. Acquisitions, IPO preparations and mining-site conversions reshape the owner base in 2026, while announced gigawatts remain far larger than completed, rent-producing IT capacity.

Listed colocation & data center REITs

Listed operators and property trusts own network-rich colocation sites and hyperscale buildings. Investors must distinguish live IT capacity from development pipelines and separate trusts from their sponsors.

Heat (est.)
  1. IBX colocation and xScale hyperscale campuses combine interconnection with liquid-cooling-ready AI capacity

    leader
    EQIX · USExposure
  2. PlatformDIGITAL campuses include Interxion in Europe and Teraco in Africa, spanning colocation and dedicated halls

    leader
    DLR · USExposure
  3. Global Data Centers expands leased capacity, including a phased liquid-cooling-ready Chennai campus beginning in 2026

    major
    IRM · USExposure
  4. CoreSite owns US colocation campuses; Denver DE3 is scheduled to open at the end of 2026

    major
    AMT · USExposure
  5. China operating campuses serve hyperscalers; DayOne is a minority investment and separately financed international platform

    major
    GDS · CNExposure
  6. Wholesale expansion at Ulanqab supports Chinese AI demand; new orders and construction exceed currently operating capacity

    major
    VNET · CNExposure
  7. Australian colocation campuses expand; OpenAI S7 Sydney cooperation is an MoU with first delivery targeted for 2027

    major
    NXT.AX · ASX · AUExposure
  8. Infinit Spaces operates Rabale, Siruseri and Noida colocation campuses; subsidiary IPO remains a filing-stage process

    major
    SIFY · INExposure
  9. Owns Asian and European data center real estate; remaining interests in Keppel DC Singapore 3 and 4 closed in February 2026

    major
    AJBU.SI · SGX · SGExposure
  10. Six established data center assets form the Singapore-listed trust; sponsor NTT remains a separate operating group

    challenger
    NTDU.SI · SGX · SGExposure
  11. HMC-managed trust owns Australian and US data center assets; FY2026 reporting confirms continued ASX listing

    challenger
    DGT.AX · ASX · AUExposure
  12. Intellicentre IC3 in Macquarie Park adds AI-ready colocation capacity with end-state power secured

    major
    MAQ.AX · ASX · AUExposure
  13. North American portfolio includes 55 data centers and interests in fully fitted hyperscale and powered-shell assets

    major
    ME8U.SI · SGX · SGExposure
  14. International data center real estate includes a 49% Osaka Data Centre 1 interest alongside industrial properties

    major
    A17U.SI · SGX · SGExposure
  15. MEGA IDC in Tseung Kwan O is designed for more than 180 MW at full buildout within its Hong Kong campus network

    major
    1686.HK · HKEX · HKExposure
  16. Owns 49.72% of CDC, whose contracted Australasian capacity exceeded 1 GW in the June 2026 valuation update

    major
    IFT.NZ · NZExposure
  17. Owned and partnership campuses include Paris and Frankfurt projects built from secured land and power allocations

    major
    GMG.AX · ASX · AUExposure
  18. 90%-owned Linton Hall signed a ten-year whole-building cloud tenant lease commencing December 2026

    niche
    DCRU.SI · SGX · SGExposure
  19. Baodi and Shanghai Jiading anchor a Chinese colocation estate reported at about 92,000 operating racks in August 2026

    major
    300383.SZ · SZSE · CNExposure
  20. Taiwan IDC operator broke ground at Lunping in August 2026; the new AI campus targets 36 MW at full development

    niche
    CHT · TWExposure

Sources: digitalrealty.com, coresite.com, nttdata.com, nextdc.com, datacenterdynamics.com, hmccapital.com.au

Private campus platforms

Private operators build hyperscale campuses and regional colocation portfolios. Their roles identify owned facilities, tenants or committed expansions while separating operating data halls from development pipelines.

Heat (est.)
  1. Richmond 1's 238 MW campus and other dedicated hyperscale sites operate under Blackstone fund ownership

    leader
    Private · USExposure
  2. Frontier Texas and Lighthouse Wisconsin expand Stargate capacity; Lighthouse is planned for completion in 2028

    leader
    Private · USExposure
  3. AIP/MGX/GIP acquired the platform in July 2026; ODATA extends DeltaFlow-enabled campuses into Latin America

    major
    Private · USExposure
  4. Blue Owl-backed platform delivers the planned Stargate New Mexico campus with on-site microgrid infrastructure

    major
    Private · USExposure
  5. DFW10 secures 190 MW of power, land and grid access beside Calpine's Texas plant; first service targets late 2026

    major
    Private · USExposure
  6. Brookfield and Ontario Teachers-backed platform develops repeatable hyperscale campuses with long-term tenant commitments

    major
    Private · USExposure
  7. CORE, CITADEL, PYRAMID and KEEP PRIME campuses provide large US colocation blocks; reported IPO remains uncompleted

    major
    Private · USExposure
  8. Red Oak's first phase is designed for 240 MW critical IT power, with larger campus expansion subject to buildout

    major
    Private · USExposure
  9. Apollo-controlled platform develops campuses including Elk Grove Village, with new substation infrastructure

    major
    Private · USExposure
  10. Global campus portfolio includes Frankfurt Offenbach, Didcot, Milan, Bangkok, Osaka and multiple US markets

    major
    Private · USExposure
  11. DigitalBridge and La Caisse jointly own the platform developing dedicated hyperscale buildings across several regions

    major
    Private · GBExposure
  12. EQT-backed build-to-suit platform develops global campuses and co-owns India's AdaniConneX venture

    major
    Private · USExposure
  13. Tambore campus added its sixth building in April 2025; separate AI City capacity remains a phased development plan

    major
    Private · BRExposure
  14. Abilene's operating first phase serves the Stargate chain; Blue Owl-backed expansion adds leased AI campus capacity

    major
    Private · USExposure
  15. Saline's The Barn campus is under construction exclusively for Oracle and OpenAI with Blackstone equity participation

    major
    Private · USExposure
  16. SBA Edge owns West Chicago and Jacksonville multi-MW colocation facilities; regional capacity is small beside the tower estate

    niche
    SBAC · USExposure
  17. SDC Austin's two-building campus targets 84 MW IT; the second building remains in construction in 2026

    major
    Private · USExposure
  18. West Jordan campus operates its initial phase while two further buildings form the financed Utah expansion

    major
    Private · USExposure
  19. Owns TekPark in Pennsylvania after October 2025 acquisition; a 100 MW power expansion targets the second half of 2026

    niche
    Private · USExposure
  20. Hillsboro 4 and 5 property acquisitions closed in May 2026; the 18 MW Hillsboro 4 multi-tenant facility is fully leased

    major
    Private · USExposure
  21. Novacap JV acquired Buffalo, Nashville and Tampa colocation facilities from 365 Data Centers in February 2026

    niche
    Private · USExposure
  22. FRA01 Frankfurt campus forms part of its hyperscale development portfolio; announced pipeline is distinct from live capacity

    challenger
    Private · USExposure

Sources: q.com, vantage-dc.com, aligneddc.com, sabeydatacenters.com, tierpoint.com, prnewswire.com

Europe & Middle East campuses

Regional operators pair constrained metro locations with Nordic power or Gulf development capital. High-density cooling and tenant commitments matter more than a site's headline masterplan size.

Heat (est.)
  1. Brookfield-backed platform operates ten European campuses and develops additional high-density hyperscale capacity

    leader
    Private · FRExposure
  2. QAJ01 Ajman is designed for 100 MW of liquid-cooled IT capacity; Tier III design certification is not operating certification

    leader
    Private · AEExposure
  3. London East and West provide colocation; London South has approval for 40 MW IT, distinct from secured campus power

    major
    Private · GBExposure
  4. STTGDC-controlled operator expands London capacity and develops Saunderton, Berlin and Milan campuses

    major
    Private · GBExposure
  5. Spring Park and other UK campuses provide critical colocation capacity under Elliott and Revcap ownership

    major
    Private · GBExposure
  6. Majority-owned Kao Data operates UK HPC colocation; 33 MW KMAN-01 Manchester targets service in third-quarter 2027

    major
    IFT.NZ · NZExposure
  7. Develops DUB10 Clondalkin and DUB20 Arklow with Starwood backing; campus plans are not treated as operating IT capacity

    major
    Private · IEExposure
  8. Operating campuses in Dublin, London and Abu Dhabi complement Amsterdam and SEGRO joint-venture developments

    major
    Private · GBExposure
  9. Nordic high-density colocation remains a private platform after CPP, Equinix and Partners Group closed the September takeover

    major
    Private · ISExposure
  10. Green Mountain OSL-Hamar operates 90 MW contracted to TikTok, with an option for 150 MW total campus capacity

    major
    AZRG.TA · TASE · ILExposure
  11. N01 Norwegian campus houses committed AI-ready buildings, with larger power capacity developed in phases

    major
    Private · NOExposure
  12. Borlange facility will host Mistral AI under a EUR 1.2 billion partnership, with opening scheduled for 2027

    major
    Private · SEExposure
  13. Fidelity-owned platform designs and operates hyperscale facilities in Europe and Asia, including a Mitsui Japan venture

    major
    Private · GBExposure
  14. I Squared-backed platform operates regional European edge-colocation sites for low-latency enterprise and AI workloads

    niche
    Private · DEExposure
  15. NEOM Oxagon agreement plans a 1.5 GW AI campus; its $5 billion first phase targets 2028 operation

    emerging
    Private · SAExposure
  16. Dubai and Abu Dhabi colocation platform announced a KKR partnership in 2025; the reviewed release did not establish closing

    major
    Private · AEExposure
  17. center3 operates Riyadh, Jeddah and Dammam data centers and develops new capacity with Saudi infrastructure partners

    major
    7010.SR · SAExposure
  18. Operational SIN01 hosts Nscale's Microsoft GPU deployment; the wider 1.2 GW SINES campus remains phased development

    major
    Private · PTExposure
  19. Narvik's 230 MW campus program serves Microsoft; additional Rubin capacity is contracted for deployment in 2027

    challenger
    Private · GBExposure
  20. Telehouse operates carrier-neutral Docklands colocation in London; this is separate from its Japanese telecom operations

    major
    9433.T · TSE · JPExposure

Sources: data4group.com, newsroom.equinix.com, ecodatacenter.tech, startcampus.pt, nscale.com

Asian hyperscale & regional operators

Asian platforms serve local cloud demand and international hyperscalers through dedicated campuses and colocation halls. Listed telco parents, private sponsors and minority joint ventures need separate attribution.

Heat (est.)
  1. Blackstone/CPP-owned campuses include TOK1 and TOK2 in Japan and large Australian, Singapore and Johor developments

    leader
    Private · AUExposure
  2. KKR/Singtel completed full acquisition on September 2, 2026; regional platform operates under refreshed STTGDC branding

    leader
    Private · SGExposure
  3. JC3 Jakarta's 120 MW campus is under construction, with its first phase scheduled for late 2026 service

    major
    Private · SGExposure
  4. Bain-backed MY06 Johor campus uses cold-plate liquid cooling; proposed Singapore expansion remains a development plan

    major
    Private · SGExposure
  5. Johor and other Asian campuses anchor the former GDS International platform; Lahti and Kouvola expand into Finland

    major
    Private · SGExposure
  6. China hyperscale campuses transferred to an HEC-led consortium in January 2026; further listed-parent roll-up is unconfirmed

    major
    Private · CNExposure
  7. Stonepeak-backed portfolio includes Japan, Korea, India and Southeast Asia, with a phased Navi Mumbai campus

    major
    Private · SGExposure
  8. NM1 Navi Mumbai offers 52 MW IT load and D1 Greater Noida 30 MW; placement covers colocation, not GPU cloud sales

    major
    Private · INExposure
  9. Mumbai DC1-DC5 supply rated-4-style colocation capacity, with additional DC6/DC7 development planned

    major
    Private · INExposure
  10. 50%-owned AdaniConneX operates Chennai 1 and develops additional Indian hyperscale campuses

    major
    ADANIENT.NS · NSE · INExposure
  11. Nxtra's controlled network includes hyperscale campuses in Mumbai, Chennai, Bengaluru, Noida and Hyderabad

    major
    BHARTIARTL.NS · NSE · INExposure
  12. Jamnagar built-to-suit agreement supplies 168 MW to Meta within two years of June 2026, with expansion options

    challenger
    RELIANCE.NS · NSE · INExposure
  13. Dongtan operations and a planned 60 MW Gumi AI center support hosting; Gumi's target opening is March 2029

    major
    018260.KS · KRX · KRExposure
  14. Jukjeon infrastructure operation and Hanam tenant role provide managed Korean data center capacity

    major
    064400.KS · KRX · KRExposure
  15. Vyoma operates Chennai and Panvel colocation and develops the next Navi Mumbai hyperscale campus

    challenger
    LT.NS · NSE · INExposure
  16. MY1 Johor plans five 40 MW buildings with 145 MW initial power allocation; first phase targets Q4 2026

    challenger
    Private · SGExposure
  17. TH01 Bangkok's first 12 MW IT phase is pre-leased to a hyperscaler for Q4 2026; another 40 MW targets 2027

    challenger
    Private · SGExposure
  18. Fully acquired Web Werks in 2025; its Mumbai, Pune and other Indian data centers now sit within IMDC

    major
    IRM · USExposure
  19. JHB1 Johor targets more than 300 MW IT across three buildings, supported by GIC and ADIA platform investment

    major
    Private · USExposure

Sources: airtrunk.com, cdn2.singteldigital.com, bridgedatacentres.com, prnewswire.com, baxtel.com, ironmountain.com

AI hosting landlords

Physical AI and HPC sites provide powered halls, colocation or vertically integrated hosting under customer contracts. Bare-space leases and GPU-cloud service agreements have different economics and are identified explicitly; mining capacity alone does not qualify.

Heat (est.)
  1. Polaris/Delta Forge leases total 1.2 GW critical IT; CoreWeave contracts 400 MW and unnamed investment-grade tenants the rest

    leader
    APLD · USExposure
  2. Approximately 590 MW critical IT is contracted to CoreWeave; deliveries are staged through early 2027 after failed merger

    leader
    CORZ · USExposure
  3. Helios delivered 133 MW IT to CoreWeave; total signed leases cover 526 MW IT supported by 800 MW gross power

    major
    GLXY · USExposure
  4. Lake Mariner's Fluidstack leases have specified Google credit support; revenue-generating capacity reached 102 MW in July

    major
    WULF · USExposure
  5. AWS and Google-supported Fluidstack leases total 600 MW gross; initial Black Pearl capacity began rent in August 2026

    major
    CIFR · USExposure
  6. River Bend's 245 MW IT Fluidstack lease has Google-backed base-term obligations; phased delivery begins in 2027

    major
    HUT · USExposure
  7. Enovum NC-1 leases 40 MW IT to Nscale for ten years; initial billing began in 2026 after commissioning delays

    challenger
    WYFI · USExposure
  8. Tydal signed a 121 MW IT, 16-year lease with Volta for an unnamed AI lab, supported by about 133 MW gross power

    challenger
    BTDR · SGExposure
  9. Sandersville leases 175 MW IT to an unnamed high-investment-grade technology tenant; delivery starts in late 2027

    challenger
    CLSK · USExposure
  10. Rockdale's AMD lease expanded to 50 MW IT after the option exercise; further capacity remains optional

    challenger
    RIOT · USExposure
  11. Cerebras signed a 40 MW IT Alabama colocation agreement; initial 15 MW phase targets December 2026 readiness

    emerging
    DGXX · USExposure
  12. TensorWave signed a 15-year Matador lease for 222 MW total facility power; delivery starts in second-half 2027

    emerging
    FRMI · USExposure
  13. Abilene leased campus capacity serves Oracle/OpenAI; a separate 900 MW Abilene development supports Microsoft

    major
    Private · USExposure
  14. Childress delivered 50 MW IT under Microsoft's GPU-cloud contract; a separate 60 MW Nvidia cloud contract ramps in 2027

    major
    IREN · AUExposure
  15. Controlled Ardent operates Pittsburgh AI colocation; the 12 MW IT plan includes 6 MW scheduled for March 2027

    niche
    RUM · USExposure

Sources: ir.applieddigital.com, galaxy.com, investors.terawulf.com, globenewswire.com, iren.gcs-web.com, ardentdc.com

Powered land & campus developers

Landowners and developers secure sites, permits, utility power and on-site generation before tenants occupy buildings. Gross power targets and non-binding options are development resources, not operating IT capacity.

Heat (est.)
  1. Paris and Frankfurt campus programs convert secured power into leased data centers through owned development partnerships

    leader
    GMG.AX · ASX · AUExposure
  2. Caldwell Valley's roughly 3,000 acres target multi-GW buildout; first 250 MW grid delivery is contracted for early 2028

    leader
    Private · USExposure
  3. Q2 2026 starts include a 260 MW build-to-suit data center project; development starts are not operating capacity

    major
    PLD · USExposure
  4. The Barn in Saline develops dedicated Oracle/OpenAI capacity with Blackstone equity and PIMCO-anchored debt

    major
    Private · USExposure
  5. Abilene Clean Campus provides the land and power framework for Crusoe's phased Stargate facilities

    major
    Private · USExposure
  6. SB Energy builds and operates OpenAI's leased 1.2 GW Milam County campus, with phased facilities under development

    major
    9984.T · TSE · JPExposure
  7. Project Matador combines permitted land and planned private power; TensorWave tenancy precedes full project financing and delivery

    emerging
    FRMI · USExposure
  8. San Marcos campus masterplan targets 1.2 GW; first 50 MW remains a late-2026 target with Evolve development support

    emerging
    Private · USExposure
  9. Bolt agreement makes Permian acreage available for future AI campuses; no completed leased campus is implied

    emerging
    TPL · USExposure
  10. PowerBridge holds an option on about 3,400 acres for a planned 2 GW Alpha Digital Campus, with power targeted from 2027

    emerging
    LB · USExposure
  11. Edged partnership develops data centers in Madrid, Barcelona, the Basque Country, Lisbon and Extremadura

    major
    MRL.MC · ESExposure
  12. Pure DC Paris JV combines secured 75 MVA power and land for a planned 48 MW IT facility, with hyperscaler pre-let targeted

    challenger
    SGRO.L · LSE · GBExposure
  13. Manor Farm's proposed 107 MW powered-shell facility remains subject to planning and tenant pre-let negotiations

    emerging
    BBOX.L · LSE · GBExposure
  14. Cosmosquare OS1 and Keihanna OS4 develop phased Osaka capacity under the privatized real-assets platform

    major
    Private · HKExposure
  15. May 2026 stakes in Mumbai, Chennai and Hyderabad projects cover about 200 MW gross capacity with CapitaLand

    challenger
    8801.T · TSE · JPExposure
  16. Frankfurt Ostend's 75,000-square-metre site supports planned data center development with Mainova WebHouse

    emerging
    Private · USExposure
  17. Moses Lake power-secured site has a September 2026 PowerSecure backup contract; an executed AI tenant lease is not verified

    emerging
    KEEL · USExposure
  18. Starwood prepares mining-site conversions and tenant leasing; June 2026 filings still classify all sites as pre-development

    emerging
    MARA · USExposure
  19. Kati 2 proposes more than 100 MW critical IT with Metrobloks; prospective neocloud tenant commitment remains non-binding

    emerging
    SLNH · USExposure
  20. Owned Snyder site deploys an initial 8 MW of Crusoe Spark modules, with phased expansion to 25 MW contemplated

    emerging
    NRGV · USExposure
  21. Temple I's 300 MW first phase is in construction for late 2027 within a larger power-secured Texas land program

    challenger
    Private · USExposure
  22. Arcola powered-shell campus has an executed long-term hyperscale lease; tenant identity is undisclosed

    major
    Private · USExposure
  23. St Leonards AI campus is under construction in Tasmania with a 104 MW Aurora power contract; operation is targeted for 2027

    emerging
    Private · AUExposure

Sources: tract.com, landbridgeco.com, texaspacific.com, quinbrook.com, powerhousedata.com, abc.net.au

Platform owners & development JVs

Listed sponsors own or co-develop data center platforms through specific funds and joint ventures. These placements identify the ownership role without treating an entire manager's assets as its shareholders' property.

Heat (est.)
  1. Managed funds own QTS and AirTrunk and co-own Saline's Oracle/OpenAI campus; platform assets remain separately identified

    leader
    BX · USExposure
  2. Managed funds own 80% of Meta Hyperion's JV and back STACK and Crusoe Abilene; role is owner and developer capital

    leader
    OWL · USExposure
  3. Partnership and co-investors own Compass and Data4 interests; BIPC is omitted as the economically equivalent wrapper

    major
    BIP · BMExposure
  4. Managed vehicles back Vantage, Switch, DataBank and jointly controlled Yondr; SoftBank takeover closing remains unverified

    major
    DBRG · USExposure
  5. Infrastructure funds own 75% of STTGDC and co-own CyrusOne; Gulf Data Hub investment adds Middle East campus exposure

    major
    KKR · USExposure
  6. Managed funds acquired a majority of Stream Data Centers in November 2025; STACK remains a separate Blue Owl-backed platform

    major
    APO · USExposure
  7. GIP/AIP vehicles co-own Aligned after July closing and partner with ACS on a global campus development platform

    major
    BLK · USExposure
  8. Owns 25% of STTGDC after September closing and controls Nxera's separate regional data center development business

    major
    Z74.SI · SGX · SGExposure
  9. 49.72% CDC stake and majority Kao Data ownership provide direct exposure to campus development and contracted capacity

    major
    IFT.NZ · NZExposure
  10. Managed vehicles retain VIRTUS exposure; Aligned ownership transferred to the AIP/MGX/GIP consortium in July 2026

    major
    MQG.AX · ASX · AUExposure
  11. 50:50 GIP development JV closed in January 2026 with a 1.7 GW pipeline; Turner construction is mapped to Hochtief

    major
    ACS.MC · ESExposure
  12. Owns about 34% of atNorth after September 2026 closing, alongside CPP's controlling stake and Partners Group

    major
    EQIX · USExposure
  13. SB Energy's Milam development supplies an executed OpenAI campus lease; DigitalBridge acquisition is still treated as pending

    major
    9984.T · TSE · JPExposure
  14. Data center funds develop Singapore's floating facility and Genting Lane expansion; Keppel DC REIT is a separate listed owner

    major
    BN4.SI · SGX · SGExposure
  15. Owns 40% of the STTGDC joint venture behind 30 MW STT Seoul 1, opened in Gasan in June 2026

    niche
    298040.KS · KRX · KRExposure
  16. Sponsors and co-invests in CIDCF, developing Navi Mumbai, Chennai and Hyderabad facilities alongside CapitaLand India Trust

    major
    9CI.SI · SGX · SGExposure
  17. Consortium participation funds Aligned's July 2026 acquisition; a separate minority stake backs Khazna's UAE campuses

    major
    Private · AEExposure
  18. Infrastructure funds own EdgeConneX and finance its hyperscale campus development across Europe and other regions

    major
    EQT.ST · Nasdaq Stockholm · SEExposure
  19. Ada Infrastructure develops Docklands; Ares Secondaries funds separately acquired a minority Sabey stake in July 2026

    major
    ARES · USExposure
  20. Funds back Digital Edge's Asian campuses; the platform raised $640 million of new equity within its 2025 financing

    major
    Private · USExposure
  21. Holds about 51% of atNorth after September 2026 closing and co-invests with Blackstone in AirTrunk

    major
    Private · CAExposure
  22. Co-led a $1.6 billion investment with ADIA in Vantage APAC, supporting Johor JHB1 and the regional development platform

    major
    Private · SGExposure
  23. Rowan portfolio company develops Temple and Cinco powered campuses; managed capital is distinct from operating capacity

    niche
    Private · GBExposure
  24. Retains a 26% minority stake in STT GDC India; this is an ownership interest rather than control of the campus operator

    niche
    TATACOMM.NS · NSE · INExposure

Sources: about.fb.com, aligneddc.com, cdn2.singteldigital.com, atnorth.com, stonepeak.com, gic.com.sg

Carrier-owned data centers

Telecom groups own colocation campuses alongside their networks. Their physical IDC businesses lease cabinets, power and halls to enterprise and cloud tenants; carrier AI-compute revenue is not treated as colocation capacity.

Heat (est.)
  1. Cloud subsidiary's Yongsan hyperscale IDC and wider Korean network lease facility capacity to enterprise and cloud customers

    major
    KT · KRExposure
  2. Pyeongchon and Pyeongchon 2 campuses provide Korean colocation with redundant power and cooling systems

    major
    032640.KS · KRX · KRExposure
  3. SK Broadband colocation and the SK-AWS Ulsan buildout provide facility capacity; initial Ulsan service targets 2027

    major
    SKM · KRExposure
  4. Tomakomai AI campus is under construction, targeting first operation by March 2027; this is the telecom operating company

    challenger
    9434.T · TSE · JPExposure
  5. Shiroi campus phase three targets fiscal 2026 opening, initially 10 MW with provision for denser liquid-cooled loads

    major
    3774.T · TSE · JPExposure
  6. Global Data Centers unit operates more than 160 facilities; former listed NTT DATA subsidiary was taken private in 2025

    major
    9432.T · TSE · JPExposure
  7. Telehouse colocation network and Osaka Sakai AI facility, opened January 2026, provide owned high-density infrastructure

    major
    9433.T · TSE · JPExposure
  8. Nxera opened 58 MW DC Tuas in February 2026, bringing its Singapore capacity to 120 MW

    major
    Z74.SI · SGX · SGExposure
  9. National IDC campuses span China's computing hubs; disclosed rack-power capacity exceeded 3.2 GW at year-end 2025

    leader
    0728.HK · HKEX · CNExposure
  10. Hohhot liquid-cooled campus forms part of its IDC network; first-half 2026 data center revenue was RMB 19 billion

    major
    0941.HK · HKEX · CNExposure
  11. Chongqing Southwest Data Center provides physical IDC infrastructure; first-half 2026 IDC revenue grew 11%

    major
    0762.HK · HKEX · CNExposure
  12. Lunping's new AIDC joins its Taiwan enterprise IDC estate; the announced 36 MW is full-build capacity, not live load

    major
    CHT · TWExposure

Sources: chinatelecom-h.com, hkexnews.hk, chinaunicom.com.hk, softbank.jp, cht.com.tw, chintglobal.com

Glossary

Critical IT load
Power available to computing equipment, excluding cooling and other facility overhead; it is smaller than gross campus power.
Colocation
Leasing space, power and cooling in a shared or dedicated data center while tenants own the computing equipment.
Powered land
A development site with a path to electricity and permits; it is not yet an operating data center.
Credit backstop
A stronger counterparty supports specified tenant obligations; the exact coverage depends on the contract.
Ready for service
A facility or phase is available for the tenant after required construction and commissioning milestones.

Heat, spend, exposure and shares are editorial estimates. How to read the map ↗