Neoclouds & GPU Clouds

Specialist operators renting accelerated compute and contracted AI hosting

Heat (est.) Spend (est.)

Contracted backlogs are enormous relative to balance sheets, which makes the segment both fast-growing and closely watched for credit stress.

Specialist clouds rent accelerated servers, while hosting developers supply powered buildings to the companies that own those servers. The distinction matters: a megawatt of colocation is not a megawatt of owned GPUs, and a signed multi-year lease is not current operating revenue.

Why now

Blackwell deliveries, Rubin reservations and financing are driving 2026 contracts. New leases at former mining sites are substantial, but commissioning remains uneven. September updates expand CoreWeave commitments and Crusoe platform value while several smaller pivots remain unproven.

Listed accelerated cloud operators

Listed operators provide rented accelerators, ranging from large frontier-lab suppliers to newly commercial businesses. Ranks reflect delivered scale and contract quality. Small initial leases and unnamed customers carry less weight than mature operating fleets.

Heat (est.)
  1. OpenAI/Meta/Anthropic GPU cloud; $104.2B Q2 backlog plus >$25B Q3 commitments; 4.2 GW contracted (est.)

    leader
    CRWV · USExposureQ2 2026 global cloud infrastructure: ~2% (est.)
  2. Targets 5 GW contracted power by YE2026 versus 800 MW-1 GW connected (est.); these are targets, not live capacity

    major
    NBIS · NLExposure
  3. Microsoft $9.7B/200 MW contract; separate Nvidia $3.4B five-year cloud contract and conditional $2.1B equity rights

    major
    IREN · AUExposure
  4. Merchant Colossus 2: Google ~$920M/month, Reflection ~$150M/month; Anthropic ~$1.25B/month spans Colossus 1/2

    major
    SPCX · USExposure
  5. OpenAI wafer-scale cloud; Q2 RPO $25.4B and >600 MW live/contracted through 2027 (est.), not all operating

    challenger
    CBRS · USExposure
  6. Nvidia anchor; August 6 TCV $8.8B and secured power 212 MW (est.), largely a 2026-27 delivery pipeline

    challenger
    SHAZ · USExposure
  7. GPU cloud plus Nscale NC-1 hosting: $865M/40 MW over 10 years (est.); first half handed over in August

    challenger
    WYFI · USExposure
  8. Via Northern Data/Quake AI, rents Nvidia GPUs; June acquisition closed; public customer TCV remains undisclosed

    challenger
    RUM · USExposure
  9. Applied Digital-controlled cloud after May spinout; owns rented GPU infrastructure; customer TCV/MW undisclosed

    niche
    CHRN · USExposure
  10. AI-native GPU customers; 155 MW total committed site capacity (est.) includes future builds, not only GPUs

    niche
    DOCN · USExposure
  11. August adds an unnamed $600M AI-cloud customer contract (est.); expands GPU purchases into 2027

    challenger
    AKAM · USExposure
  12. ALPHA-01: 504 B200 GPUs and $32.2M two-year unnamed lab lease (est.); live since May

    emerging
    ALP · VGExposure
  13. HGX B200 service earns revenue under an August multi-year AI customer contract; buyer and contract value undisclosed

    emerging
    MOVE · USExposure

Sources: investors.coreweave.com, assets.nebius.com, sec.gov, reuters.com, globenewswire.com, srgresearch.com

Large private GPU and TPU clouds

Private providers combine compute operations with large construction and financing programs. Their contract totals often include campus services as well as rented accelerators. Proposed IPOs, fundraising discussions and planned power are explicitly distinct from completed events.

Heat (est.)
  1. Reported Jane Street cloud contract ~$13B over five years; disclosed >$140B platform TCV also includes campuses

    leader
    Private · USExposurereported
  2. Reported TCV $103B (est.), including Anthropic; Microsoft anchors Kvandal; proposed IPO has not closed

    major
    Private · GBExposurereported
  3. Anthropic announces $50B US build with its GPU/TPU cloud (est.); a development program, not delivered MW

    major
    Private · USExposure
  4. Reported Anthropic $35B/350 MW supply pact (est.) at Hut 8 Beacon Point; future delivery, IPO not completed

    major
    Private · USExposurereported
  5. Project Southgate Nvidia cloud; August private round >$10.5B valuation (est.); client TCV/live MW undisclosed

    major
    Private · AUExposure
  6. Dedicated GPU clusters and inference; Q2 annualized bookings $1.15B (est.) are not contracted backlog

    major
    Private · USExposure
  7. AMD MI355X Ohio build targets 50 MW (est.); LuminArx/AMD-backed cloud, named anchor and backlog undisclosed

    challenger
    Private · USExposure
  8. AMD Instinct specialist; ~14 MW live versus 500 MW leased pipeline (est.); customer TCV undisclosed

    challenger
    Private · USExposure
  9. Voltage Park merger completed; Cursor/Reflection customers; >36k owned Nvidia GPUs (est.), dollar TCV undisclosed

    challenger
    Private · USExposure
  10. Announced Taiwan Blackwell factory: 16 MW/~7k GPUs (est.); March 2026 commissioning target remains unverified

    challenger
    Private · USExposure
  11. Hyperstack GPU cloud; USD.AI finances a $34M B200 deployment (est.); customer backlog/MW undisclosed

    niche
    Private · GBExposure
  12. Canadian-owned Denvr AI Cloud offers H200/H100 bare metal and dedicated model endpoints across Canada and the US

    niche
    Private · CAExposure
  13. Reported February Ori merger forms Brookfield's Radiant AI cloud; GPU services continue under the enlarged platform

    niche
    Private · USExposurereported

Sources: crusoe.ai, reuters.com, bloomberg.com, denvr.com

Mining sites with signed AI business

Power-rich mining operators are becoming AI landlords or GPU service providers. Only signed hosting or commercial compute businesses appear here. Options, grid reservations and uncontracted development pipelines are excluded from contracted capacity.

Heat (est.)
  1. CoreWeave plus AMD leases: 1.1 GW/>$24B base value (est.); 437 MW billing mid-July, later AMD delivery

    leader
    CORZ · USExposure
  2. CoreWeave/two unnamed hyperscalers: 1,410 MW/$36B base leases (est.); 175 MW live at July update

    major
    APLD · USExposure
  3. River Bend/Beacon Point: 949 MW IT/$26.6B base leases (est.); first data-hall deliveries in 2027

    major
    HUT · USExposure
  4. Anthropic signs 401 MW/$19B lease (est.); Lake Mariner 102 MW live (est.); Abernathy stake sold in July

    major
    WULF · USExposure
  5. AWS $5.5B/15-year lease (est.), first rent in August; Fluidstack/Google-backed Barber Lake still ramping

    major
    CIFR · USExposure
  6. CoreWeave leases 526 MW IT at Helios (est.); first 133 MW IT delivered (est.); further phases due 2027

    major
    GLXY · USExposure
  7. Childress Microsoft lease: 200 MW IT over five years (est.); first 50 MW tranche delivered in August (est.)

    major
    IREN · AUExposure
  8. Meta-guaranteed Sandersville: 175 MW/$6.6B over 20 years (est.); initial delivery Q4 2027

    challenger
    CLSK · USExposure
  9. Rockdale: AMD 50 MW plus unnamed lab 191 MW/$9.1B base (est.); 25 MW live, lab delivery starts Dec 2027

    challenger
    RIOT · USExposure
  10. NC-1 Nscale lease: 40 MW/$865M base term (est.); 20 MW billing in August (est.), balance targeted thereafter

    challenger
    WYFI · USExposure
  11. BUZZ signs $220M Bell/Cohere and $350M enterprise GPU contracts (est.); new clusters due late 2026-27

    challenger
    HIVE · USExposure
  12. Owns Tydal: signed 121 MW IT Volta lease, ~$4.7B/16 years; phases due Dec 2026/Mar 2027, with tenant exit at year 10

    challenger
    BTDR · SGExposure
  13. Cerebras Alabama hosting: 40 MW/$1.1B over 10 years (est.); deliveries scheduled December to Q1 2027

    emerging
    DGXX · USExposure
  14. Michigan neocloud lease: 20 MW critical load/10-year base term (est.); $1.2B includes renewal options (est.)

    emerging
    GPUS · USExposure
  15. EcoHash starts commercial GPU service in September; 3 MW AI-ready section (est.) is part of a 50 MW Georgia mining site

    emerging
    CANG · USExposure

Sources: investors.corescientific.com, ir.applieddigital.com, hut8.com, investors.terawulf.com, cangoonline.com, stocktitan.net

GPU marketplaces and inference clouds

Marketplaces aggregate hardware supply, while inference clouds sell model execution rather than entire buildings. Fleet counts can include third-party GPUs. Undisclosed power and backlog are left unestimated, especially where customers buy short-duration usage.

Heat (est.)
  1. Sells open-model inference and dedicated Nvidia clusters; contracted customer backlog and live MW undisclosed

    major
    Private · USExposure
  2. Serverless and dedicated GPU cloud plus Community Cloud; June funding $100M (est.); MW/backlog undisclosed

    major
    Private · USExposure
  3. Independent LPU inference cloud; August footprint 54 MW (est.); 200+ MW target for 2027 (est.), not backlog

    major
    Private · USExposure
  4. Sells wafer-scale inference; OpenAI anchors 750 MW phased supply (est.); not a Nvidia GPU reseller

    challenger
    CBRS · USExposure
  5. Combines AI development tools with Voltage Park-owned GPUs; marketplace-to-owned-cloud integration completed

    challenger
    Private · USExposure
  6. Matches developers with third-party GPU owners; marketplace listings are not owned fleet or committed backlog

    niche
    Private · USExposure
  7. Aggregates GPU rentals and inference, including Qumulus supply; own customer TCV and active MW undisclosed

    niche
    Private · USExposure
  8. Trades short-duration GPU clusters for AI developers; exchange availability is not long-term contracted MW

    niche
    Private · USExposure
  9. Signs Canopy Wave inference-cloud merger; closing targets end-2026, with SAIH still the current listed issuer

    emerging
    SAIH · SGExposure
  10. Managed open-model inference and reinforcement-learning infrastructure; July Series D finances additional serving capacity

    major
    Private · USExposure
  11. Runs dedicated model inference and post-training deployments; June Series F funds infrastructure for production workloads

    major
    Private · USExposure
  12. Managed model endpoints use a multi-cloud GPU fleet; checkpointing reduces cold starts for intermittently used inference

    challenger
    Private · USExposure
  13. Hosts open-model inference APIs and dedicated GPU deployments; May Series B funds expanded model-serving capacity

    challenger
    Private · USExposure
  14. Routes open-model inference across distributed GPU providers; latency and utilization management are its service layer

    niche
    Private · USExposure
  15. Serverless GPU inference serves image, video and audio models; December Series D funds global capacity expansion

    challenger
    Private · USExposure
  16. Owns Replicate since December 2025; model catalog and deployment API supply inference alongside Workers AI

    major
    NET · USExposure

Sources: deepinfra.com, blog.fal.ai, blog.cloudflare.com, ir.saiheat.com, fireworks.ai, baseten.co

Asian and African GPU clouds

Regional suppliers serve national programs and local enterprises that need domestic GPU access. Rankings emphasize verifiable deployments and contracts. Announced chip orders, financing plans and government allocations are not counted as commissioned capacity.

Heat (est.)
  1. Shakti Cloud's 20,736 B300 rollout (est.) includes Nvidia's four-year service commitment; full acceptance unverified

    major
    Private · INExposure
  2. Koukaryoku cloud serves Japanese enterprises/researchers; ~1,100 Blackwell GPUs live by February (est.)

    major
    3778.T · TSE · JPExposure~69% of METI's JPY72.5B 2024 GPU subsidy pool (est.)
  3. National GPUaaS supplier; June allocation 4,120 B300/Rubin GPUs (est.), phased through H1 2027

    major
    035420.KS · KRX · KRExposure
  4. Via NTT DATA, offers Japanese DGX B200 GPU cloud; enterprise GPU backlog and active GPU MW undisclosed

    major
    9432.T · TSE · JPExposure
  5. Osaka Sakai GB200 cloud serves Japanese enterprises; GPU customer backlog and active GPU MW undisclosed

    major
    9433.T · TSE · JPExposure
  6. Via KT Cloud AI Train, rents H100/A100 clusters; named anchor, GPU-only backlog and active MW undisclosed

    niche
    KT · KRExposure
  7. National research customer on live B300/H100 GPUaaS; KRW15.3B service project (est.), July 2026-March 2027

    major
    018260.KS · KRX · KRExposure
  8. Rents Gwangju B200 capacity commercially to Korean enterprises; paid GPU backlog and utilization undisclosed

    major
    181710.KS · KRX · KRExposure
  9. Vietnam/Japan H100/H200 cloud serves enterprises and developers; B300 announced, customer TCV/MW undisclosed

    major
    FPT.VN · VNExposure
  10. August fleet: 96 H200 and 25 B300 servers (est.); further deliveries pending; customer TCV/MW undisclosed

    challenger
    4784.T · TSE · JPExposure
  11. Unnamed Indian sovereign AI customer signs INR10B term sheet (est.) through June 2029 for deployed Blackwell

    challenger
    E2E.NS · NSE · INExposure
  12. AICA and national research GPU supplier; H100/B200 service contract May-December 2026; TCV/MW undisclosed

    challenger
    Private · KRExposure
  13. Johor GB200 NVL72 GPU cloud is operating; 600 MW park potential (est.) is not commissioned GPU capacity

    challenger
    6742.KL · MYExposure
  14. Vayu rents H100/H200/L40S to enterprise users; named GPU anchor, contracted backlog and active MW undisclosed

    niche
    TATACOMM.NS · NSE · INExposure
  15. Reported IndiaAI allocation of ~4,096 B200 GPUs (est.); full commissioning and utilization remain unverified

    challenger
    Private · INExposurereported
  16. Operates Japanese B200/A100 GPU cloud and expands domestic sites; customer TCV and power not disclosed

    niche
    Private · JPExposure
  17. Own-GPU contracts in Japan/Australia survive August cancellation of upstream rerented compute; Thailand remains an MOU

    emerging
    3905.T · TSE · JPExposure
  18. Cassava AI announces South African Nvidia GPUaaS and model APIs; broader African factory rollout remains phased

    emerging
    Private · GBExposure
  19. AI Data Center GPU Cloud uses Infrinia AI Cloud OS and domestic GB200s; beta live, commercial launch targets October

    emerging
    9434.T · TSE · JPExposure
  20. Thai Nvidia Cloud Partner rents H100/H200 clusters; DDN confirms an initial 1,000-GPU deployment (est.)

    challenger
    Private · THExposure
  21. Blackstone-backed AI cloud plans 20k+ GPUs (est.); $600M equity plus proposed matching debt (est.) is not delivered capacity

    challenger
    Private · INExposure
  22. Indian cloud rents H100/A100 VMs, bare-metal GPUs and Kubernetes AI Pods; frontier-model ambitions no longer define the fleet

    niche
    Private · INExposure
  23. H200 GPU instances and distributed inference pair with regional networking; AI Gateway provides unified model access

    niche
    Private · USExposure
  24. Government-backed B200 allocation supplies Korean startups and researchers through Kakao Cloud, distinct from KOACC ownership

    niche
    035720.KS · KRX · KRExposure

Sources: sakura.ad.jp, internet.gmo, datasection.co.jp, business-standard.com, ddn.com, meti.go.jp

European sovereign GPU specialists

European specialists compete on local jurisdiction, power access and accelerator availability. Some operate live clouds while building much larger campuses. Announced sovereign projects are checked for pauses, changes of customer and unfinished construction.

Heat (est.)
  1. European GPU cloud; 2026 revenue guide $3.0-3.4B and exit ARR $7-9B (est.) depend on phased capacity delivery

    major
    NBIS · NLExposure
  2. GPU DDTL funds Norway/Portugal/Iceland/UK clusters; reported Stargate UK pause is separate from Microsoft Kvandal

    major
    Private · GBExposurereported
  3. Mistral Compute builds French Blackwell cloud; 13,800 GPUs financed for Paris cluster (est.); Sweden due 2027

    challenger
    Private · FRExposure
  4. European GPU instances and managed inference serve enterprise users; public GPU-only backlog/MW undisclosed

    major
    OVH.PA · Euronext Paris · FRExposure
  5. Via Scaleway, supplies European GPUs and trusted cloud for Airbus; GPU-specific backlog/MW undisclosed

    major
    Private · FRExposure
  6. Former DataCrunch runs Nordic GPU cloud; 2026 funding supports expansion; customer TCV/live MW undisclosed

    challenger
    Private · FIExposure
  7. Hyperstack expands Nordic Blackwell clusters; $34M USD.AI facility (est.) funds Sweden B200 deployment

    challenger
    Private · GBExposure
  8. Exaion majority acquisition closed Q1 2026; French sovereign GPU cloud operates, with TCV/MW undisclosed

    niche
    MARA · USExposure
  9. European sovereign GPU servers and AI inference; neither GPU customer backlog nor active GPU MW disclosed

    niche
    IOS.DE · XETRA · DEExposure
  10. Dedicated RTX PRO GPU servers for developers; no disclosed long-term GPU customer backlog or facility MW

    niche
    Private · DEExposure
  11. Commercial cloud and Blackwell services are live; proposed Stockholm and France campuses remain expansion projects

    emerging
    Private · SEExposure
  12. Reported Radiant/Ori combination adds European GPU operations to Brookfield's AI program; site-level delivered MW undisclosed

    niche
    Private · USExposurereported
  13. Managed European Blackwell clusters offer B200/B300 HGX nodes and NVL72 racks; availability is product-specific

    niche
    Private · GBExposure
  14. French AI factories and on-demand H100 cloud operate alongside planned SoftBank Bosquel 1 GW campus (est.)

    challenger
    Private · FRExposure
  15. UK sovereign AI platform offers B200 GPUs and CivoStack/FlexCore private deployments for regulated workloads

    niche
    Private · GBExposure

Sources: assets.nebius.com, nscale.com, reuters.com, corporate.ovhcloud.com, ori.co, cudocompute.com

Chinese compute leasing providers

Domestic listed suppliers rent computing infrastructure, often alongside equipment sales or telecom work. Revenue from resale is separated from recurring leasing. Unnamed customer contracts, rented capacity and export restrictions limit comparisons with US neoclouds.

Heat (est.)
  1. Xiechuang intelligent-compute business scales in H1 2026; GPU lease customers, MW and backlog not separately given

    major
    300857.SZ · SZSE · CNExposure
  2. H1 compute leasing revenue RMB614M (est.); owned and re-rented compute mixed; no comparable contracted MW

    major
    603629.SS · SSE · CNExposure
  3. Independent GPU cloud; September says GPU utilization >90%; named anchor, contract backlog and MW undisclosed

    challenger
    688158.SS · SSE · CNExposure
  4. GPU bare-metal cloud expands Chinese sites; proposed RMB1.59B financing (est.) is not customer backlog

    challenger
    300846.SZ · SZSE · CNExposure
  5. March unnamed customer compute contract RMB428.5M over three years (est.); no disclosed MW or chip model

    challenger
    603220.SS · SSE · CNExposure
  6. Small compute-leasing/integration business; H1 AI revenue RMB51.7M (est.), sharply lower; TCV/MW undisclosed

    niche
    002229.SZ · SZSE · CNExposure
  7. SenseCore serves four external foundation-model providers; 2.4T daily tokens in July (est.) is throughput, not leased MW

    major
    0020.HK · HKEX · CNExposure
  8. Compute Cloud and edge AI gateway grow in H1; provides model access and scheduling alongside hosted compute

    niche
    300017.SZ · SZSE · CNExposure
  9. H1 filing discloses compute leasing and equipment sales through Aofei Intelligent Computing; AI capacity is not all IDC MW

    challenger
    300738.SZ · SZSE · CNExposure
  10. Wuxiang Yungu supports its operating Token Factory; H1 compute-network revenue includes service and infrastructure activities

    challenger
    002929.SZ · SZSE · CNExposure
  11. Reported Beijing/Tianjin intelligent-compute services have RMB100M+ annual contracts (est.); distinct from rack colocation

    niche
    300383.SZ · SZSE · CNExposurereported
  12. Songjiang phase two completes delivery and enters operation in H1; serves Shanghai public AI-compute infrastructure

    challenger
    600602.SS · SSE · CNExposure

Sources: money.finance.sina.com.cn, stockmc.xueqiu.com, disc.static.szse.cn, sensetime.com

Glossary

Critical IT load
Power available to computing equipment; gross site power also includes cooling and other facility loads.
TCV
Total contract value across a contract term; it may include options or services absent from accounting backlog.
RPO
Remaining performance obligations under accounting rules; not directly comparable with every company's TCV.
GPUaaS
GPU capacity rented as a cloud service; the operator or a financing partner supplies the hardware.
Take-or-pay
A customer owes contracted payments once delivery conditions are met, even if it uses less capacity.

Heat, spend, exposure and shares are editorial estimates. How to read the map ↗